List of library documents
- 1135 RfR Issuance Jiangxi Fengcheng Mining Administration CMM Utilization Project EB53
- 1202 RfR Issuance Burning of solid biomass for process steam generation for beer manufacture in place of the BPF 3 fuel oil at the Águas Claras do Sul Branch EB54
- 1249 RfR Issuance Palmas del Espino – Biogas recovery and heat generation from Palm Oil Mill Effluent (POME) ponds, Peru EB54
- 1261 RfR Issuance Guohua Inner Mongolia Huitengliang Wind Farm Project EB54
- 151 RfR Issuance Quimobásicos HFC Recovery and Decomposition Project EB54
- 1698 RfR Hanpingzui Hydropower Project in Gansu Province EB54
- 1729 RfR Issuance Ma Steel (old plant) CDQ and waste heat utilization project EB54
- 1900 RfR Issuance Duerping Coal Mine Methane Utilization Project EB54
- 1929 RfR Issuance Nantong Coalmine Methane EB53
- 193 RfR Issuance HFC23 Decomposition Project of Zhejiang Juhua Co., Ltd, P. R. China EB54
- 2151 RfR Issuance Yunnan Leidatan 108MW Hydropower Project EB54
- 2162 RfR Issuance Yidaoqiao Hydropower Project in Tiechang River, Jiulong County, Sichuan Province EB54
- 2522 RfR Yangxin Huaxin Cement 18MW Waste Heat Recovery as Power Project EB52
- 2526 RfR Shandong Kenli Biomass Generation Project EB52
- 2625 RfR Yunnan Maguan Laqi Hydropower Project EB52
- 2702 RfR China Sichuan Province Liuping Hydropower Project EB52
- 2791 RfR Guangxi Baise Tianlin Baile Hydropower Station EB51
- 2808 RfR Sichuan Heishui Changde 20MW Hydropower Project EB52
- 2818 RfR Pingdingshan Coal (Group) Company Chaochuan Mine 6*2MW Coke Oven Gas Cogeneration Project EB53
- 2818 RfR Pingdingshan Coal (Group) Company Chaochuan Mine 6*2MW Coke Oven Gas Cogeneration Project EB53
- 2831 RfR Huadian Laizhou Wind Farm Project EB53
- 2840 RfR Datong River Tianwanggou Hydropower Station EB52
- 2842 RfR Hunan Xiaotan Hydropower Project EB53
- 2862 RfR Sichuan Luding Moxi 20MW Hydropower Project EB52
- 2869 RfR Yunnan Diqing Jisha Hydropower Project EB52
- 2879 RfR Yunnan Province Luxi City Wanma River 2nd Level Hydropower Station EB52
- 2928 RfR Sunquest Biomass Renewable Energy Project EB53
- 2932 RfR Tao River Lianlu Cascade II (Xiacheng) 37.5MW Hydropower Project in Gansu Province, China EB53
- 2933 RfR Hunan Tongdao Yaolaitan 5.55MW Hydro Power Project EB52
- 2943 RfR N2O reduction project at the WNA I nitric acid plant of Deepak Fertilisers & Petrochemicals Corporation Ltd. (“Deepak”), India EB52
- 2948 RfR Installation of Natural Gas based package cogeneration systems at industrial facilities in Gujarat by Gujarat Gas Company Limited (GGCL), India. EB52
- 2960 RfR Chongqing Jinjiaba HydroElectric Project EB53
- 2961 RfR Sichuan Fengyanbao 44MW Hydropower Project EB52
- 2970 RfR TBEC Tha Chang Biogas Project EB52
- 2972 RfR Eryuan Huian Hydropower Station EB52
- 2973 RfR Hunan Zaoshi Hydropower Project EB52
- 2986 RfR Xincun and Wenzhu Bundled Small Hydropower Project in Zhaoping County, Guangxi Zhuang Autonomous Region, China EB52
- 3 RfR Credit Period Renewal HFC Decomposition Project in Ulsan EB54
- 3002 RfR São Domingos II Hydroelectric Project EB52
- 3004 RfR Filmax Biomass Thermal Energy Project EB53
- 3005 RfR North Longyuan Huitengliang Wind Power Project EB53
- 3008 RfR Nanjing Jinling Grid Connected Natural Gas Combined Cycle Power Plant Project EB52
- 3012 RfR Yunnan Lufeng Tuo’an 10MW Hydropower Project EB53
- 3013 RfR Hebei Baoding biomass combined stoves and heater (BCSH) Project 1 EB52
- 3014 RfR Yunnan Province Yingjiang County Nanpian River Hydropower Station EB54
- 3015 RfR Yunnan Kegonghe 10MW Hydropower Project EB54
- 3044 RfR Jianli Kaidi Biomass Power Project EB52
- 3047 RfR Chongqing Longshui 8MW Hydro Power Project EB53
- 3048 RfR Cimentos do Mozambique – Matola Gas Company Fuel Switch Project EB52
- 3052 RfR Hubei Baokang Siping Hydropower Station EB54
- 3081 RfR Yinqiao and Luojiaba 11.5 MW Bundled Hydropower Project in Guizhou Province EB54
- 3082 RfR Yunnan Youfanggou Hydropower Project EB54
- 3085 RfR Green to Energy Wastewater Treatment Project in Thailand EB54
- 3107 RfR Xinjiang Dabancheng Sanchang Phase IV Wind Power Project EB54
- 3113 RfR Gutanhe 10 MW Hydropower Project in Yunnan Province EB53
- 3122 RfR Jilin Longyuan Changling Shuanglong Phase I Wind Power Project EB54
- 3128 RfR Yunnan Dali Dafengba 48MW Wind Power Project EB54
- 3135 RfR 24 MW Waste Heat Recovery for Power Generation Project at Ningxia Saima Industry Co., Ltd. EB54
- 3142 RfR Roaring 40’s Wind Farms (Khandke) Private Limited EB54
- 3168 RfR Hubei Wangjiahe Hydropower Project EB54
- 3174 RfR Yunnan Province Yingjiang County Nanlang River 2nd Level Hydropower Station EB53
- 3181 RfR Renewable biomass based thermal energy generation in Mangal Textile Mills (I) Pvt. Ltd. EB54
- 3184 RfR Bio-mass (Rice Husk) based Cogeneration project at M/s Rayana Paper Board Industries Ltd. (RPBIL), Vill: Dhaurahra, Post: Digha, Distt: Sant Kabir Nagar- 272 175, Uttar Pradesh EB54
- 3185 RfR Shanxi Gaoping biomass combined stoves and heater (BCSH) Project 1 EB54
- 3188 RfR Thermal energy generation from renewable biomass by Amir Chand Jagdish Kumar Exports Ltd. EB54
- 3189 RfR 6 MW Biomass Based Power Project in Assam by BEPL EB54
- 3211 RfR Funing County Baida Hydropower Station EB54
- 3212 RfR Funing County Gula Township Nalin Hydropower Station EB54
- 3225 RfR Energy efficient power generation in Tirora, India EB54
- 3269 RfR Guangxi Longsheng Lejiang Hydropower Project EB54
- 3280 RfR Yunnan Wenshan Yanlashan Hydropower Project EB54
- 332 RfR Issuance Ajbapur Sugar Complex Cogeneration Project EB54
- 792 RfR Issuance "14.65 MW Wind Power Project" in Maharashtra by BF Utilities Ltd. EB54
- 838 RfR Issuance GHG emission reduction by thermal oxidation of HFC 23 at Navin Fluorine International Limited (NFIL), Surat, Gujarat, India EB54
- 85 RfR Issuance Hapugastenne and Hulu Ganga Small Hydropower Projects. EB54
- A Brazilian Implementation Guide The CDM 2009
- Brazil DNA website
- CDM Validation and Verification Manual v01.1
- CDM-PDD Guidance for completing the PDD and NM v07
- CDM-SSC-PDD Guidance for completing the PDD and NM v05
- Carbonflow Connect+ Release Notes v2.4
- Carbonflow Connect+ User Guide v2.4
- China DNA website
- Clarification of elements of a written approval v01
- Clarifications - Methodology Afforestation/Reforestation
- Clarifications - Methodology Large Scale
- Clarifications - Methodology Small Scale
- Completeness Check Request for Issuance
- Completeness Check Request for Registration
- Facilitate the implementation of the procedures for review referred to in para. 65 of the modalities and procedures for a CDM v05
- Forms - CDM Registry
- Forms - Issuance
- Forms - Methodologies (Afforestation/Reforestation)
- Forms - Methodologies Large Scale
- Forms - Methodologies Small Scale
- Forms - Project Design Documents
- Forms - Registration/Validation
- Forms - Renewal of the Crediting Period
- Guidance on the assessment of investment analysis v02_1
- Guidelines & Clarifications - Issuance
- Guidelines & Guidance - Methodology Afforestation/Reforestation
- Guidelines & Guidance - Methodology Large Scale
- Guidelines & Guidance - Methodology Small Scale
- Guidelines for completing the Monitoring Report Form, including the Form (CDM-MR) v01
- Guidelines for the consideration of request for review and review cases v01
- Guidelines on assessment of different types of changes from the project activity as described in the registered PDD v01
- Guidelines on completeness check of requests for issuance v01
- Guidelines on completeness check of requests for registration v01
- Guidelines on the Assessment of Investment Analysis v03_1
- Guidelines on the Registration Fee Schedule for Proposed Project Activities under the CDM v02
- Guidelines on the demonstration and assessment of prior consideration of the CDM v03
- Guidelines on the registration fee schedule for proposed project activities under the CDM v01
- Guidelines, Guidance & Clarifications - Registration/Validation
- IGES Cambodia Fact Sheet current version
- IGES China Fact Sheet current version
- IGES Electricity Grid emission factors current version
- IGES India Fact Sheet current version
- IGES Indonesia Fact Sheet current version
- IGES Lao PDR Fact Sheet current version
- IGES Philippines Fact Sheet current version
- IGES Thailand Fact Sheet current version
- India DNA website
- Manual for Submitting CDM Project Activities V2 July 1 2008 (Brazil)
- Pitfall 01 Small scale selected for a large scale project
- Pitfall 02 Project participants not identified clearly
- Pitfall 03 Evidence of national regulatory approvals not provided
- Pitfall 04 Letter of Approval insufficient or delayed
- Pitfall 05 No written confirmation of no diversion of ODA
- Pitfall 06 Modalities of Communication not complete
- Pitfall 07 Insufficient description of the technology
- Pitfall 08 Compliance with applicability conditions not explained
- Pitfall 09 Insufficient explanation of baseline scenarios
- Pitfall 10 Insufficient explanation of project additionality - Barrier Analysis
- Pitfall 10 Insufficient explanation of project additionality - Common Practice
- Pitfall 10 Insufficient explanation of project additionality - Investment Analysis
- Pitfall 10 Insufficient explanation of project additionality - process overview
- Pitfall 11 Baseline information not sufficiently supported by references or evidence
- Pitfall 12 Major risks to the baseline and project not identified
- Pitfall 13 Absence of baseline data
- Pitfall 14 Lack of logic and consistency in PDD
- Pitfall 15 Poor quality of the PDD
- Pitfall 16 Claims in the PDD not match the project site
- Pitfall 17 Project boundaries not defined clearly
- Pitfall 18 Project start date and evidence of prior consideration of CDM unclear
- Pitfall 19 Insufficient information on measurement methods and source data
- Pitfall 20 Deviations from monitoring methodology not suffficiently justified
- Pitfall 21 Monitoring and project management procedures not defined
- Pitfall 22 Deviations from selected calculations in methodology not justified or incorrect formulas applied
- Pitfall 23 Compliance with local legal requirements not covered sufficiently
- Pitfall 25 Long delays in validation process
- Pitfall 26 Insufficient information on physical location of project for unique location
- Pitfall 27 Lack of management of change during project implementation
- Pitfall 28 Inconsistencies between PDD and "as built" project
- Pitfall 29 Inconsistent data in monitoring records
- Pitfall 30 Inadequate Monitoring equipment
- Pitfall 31 Project equipment different from registered PDD
- Pitfall 32 Large difference between PDD and monitoring report
- Pitfall 33 Insufficient information in monitoring report
- Pitfall 34 Crediting period different to that registered
- Pitfall 35 Inefficient control of documents
- Pitfall 36 Incorrect information in monitoring report
- Pitfall 37 Monitoring plan deviates from registered PDD
- Pitfall 38 Poorly installed or tagged monitoring equipment
- Procedures and documentation which need to be used for the renewal of a crediting period
- Procedures for Requests for Issuance of CERs v01
- Procedures for Requests for Registration of Proposed CDM Project Activities v01
- Procedures for Withdrawal of Requests for Issuance
- Procedures for Withdrawal of a Request for Registration v01
- Revision to the clarifications to facilitate the implementation of the procedures for review as referred to in para. 41 of the CDM modalities and procedures v08
- SSC C/R AMS-I.A. AMS-I.D. v13 Degummed and neutralized oil as biomass
- SSC C/R AMS-I.A. v06 Clarifications on Type I-Renewable Energy and Type III-Other Project Activities
- SSC C/R AMS-I.A. v12 Revision of AMS I.A to allow for application to households and users with limited grid access and to situations of suppressed demand
- SSC C/R AMS-I.A. v12 Solar Home Systems, Bangladesh
- SSC C/R AMS-I.A. v12 d.light rural lighting India
- SSC C/R AMS-I.C. AMS-I.D. v13 Applicability of AMS-I.D. and AMS-I.C. to a greenfield cogeneration project that is not implemented by a captive user
- SSC C/R AMS-I.C. AMS-I.D. v13 Clarification on use of AMS-I.C and AMS-I.D for a project using biogas from gas water
- SSC C/R AMS-I.C. AMS-I.D. v13 Clarification on vintage of data and survey period for assessment of biomass availability in AMS-I.D
- SSC C/R AMS-I.C. AMS-II.D. v13 Clarification request on applicability of AMS I.C and AMS II.D to a project activity at a Brickworks in Morocco
- SSC C/R AMS-I.C. v13 Applicability of AMS-I.C for project activity generating heat whose direct measurement is not possible
- SSC C/R AMS-I.C. v13 Applicability of AMS-I.C to cogeneration projects displacing grid electricity and surplus electricity exporting to the grid
- SSC C/R AMS-I.C. v13 Applicability of AMS-I.C to project activity replacing old fossil fuel and biomass boilers with a new biomass boiler
- SSC C/R AMS-I.C. v13 Applicability of AMS-I.D. and AMS-I.C. to a greenfield cogeneration project that is not implemented by a captive user
- SSC C/R AMS-I.C. v13 Applicability of SSC Type I methodologies for fossil fuel displacement in metal ore reduction processes
- SSC C/R AMS-I.C. v13 Application of paragraph 16 in AMS-I.C. version 13 to existing fossil fuelled facilities
- SSC C/R AMS-I.C. v13 Clarification about the project boundary in AMS-I.C for cogeneration projects that run in parallel with existing cogeneration unit
- SSC C/R AMS-I.C. v13 Clarification on applicability of AMS-I.C regarding installed capacity limit for project activity with back-up capacity
- SSC C/R AMS-I.C. v13 Clarification on the use of AMS I.C related to renewable biomass cogeneration projects that export electricity to the grid
- SSC C/R AMS-I.C. v13 Clarification on thermal energy production capacity of cogeneration project activity using AMS-I.C
- SSC C/R AMS-I.C. v13 Clarification regarding metering the energy produced by a sample of the systems
- SSC C/R AMS-I.C. v13 Clarification regarding the interpretation of grid import and determining baseline emission factor in AMS-I.C
- SSC C/R AMS-I.C. v13 Query on baseline definition for a greenfield project
- SSC C/R AMS-I.C. v13 Request for clarification regarding use of Specific Emission Factor in AMS I.C
- SSC C/R AMS-I.C. v14 Clarification on AMS-I.C version 14 for separate heat and power
- SSC C/R AMS-I.C. v14 Clarification on determining baseline efficiency for cooking stoves using AMS-I.C
- SSC C/R AMS-I.C. v14 Clarification on leakage in project activity using animal litter
- SSC C/R AMS-I.C. v14 Clarification on the applicability of AMS-I.C. regarding a back-up unit for consideration of installed capacity limit
- SSC C/R AMS-I.C. v14 Clarification on the details of the monitoring requirements
- SSC C/R AMS-I.C. v14 Clarification on the operation of stand-by units in a centralized cogeneration system applying AMS-I.C
- SSC C/R AMS-I.C. v14 Clarification regarding baseline scenario of a greenfield biomass cogeneration project in AMS-I.C
- SSC C/R AMS-I.C. v14 Inclusion of avoided transportation emissions due to reduced use of fossil fuel in project activity
- SSC C/R AMS-I.C. v14 Revision of AMS-I.C regarding processed renewable biomass, thermal capacity of co-fired system and extending the project boundary
- SSC C/R AMS-I.C. v15 Clarification on the applicability of AMS-I.C to a new biomass cogeneration project exporting electricity to a grid
- SSC C/R AMS-I.C. v15 Clarification regarding project/leakage emissions from imported biomass
- SSC C/R AMS-I.C. v15 Revision of AMS-I.C to be consistent with AMS-I.E
- SSC C/R AMS-I.C. v15 Revision of AMS-I.C to include additional baseline scenario(s) for cogeneration
- SSC C/R AMS-I.C. v15 Revision of AMS-I.C to include additional baseline scenario(s) for cogeneration
- SSC C/R AMS-I.C. v15 Revision of AMS-I.C to include isolated mini-grids in the baseline scenario and plant oil as a fuel source
- SSC C/R AMS-I.C. v15 Revision of AMS-I.C to include monitoring of thermal energy output of household-biogas stoves
- SSC C/R AMS-I.C. v16 Clarification on calculation of baseline emissions for retrofitted boilers in AMS-1.C
- SSC C/R AMS-I.D. v13 Applicability of AMS-I.D for project activity involving an addition of back-pressure turbine generator in existing cogeneration system
- SSC C/R AMS-I.D. v13 Applicability of AMS-I.D for project activity using biomass sourced from another country and using bunker fuel for the biomass transportation
- SSC C/R AMS-I.D. v13 Applicability of AMS-I.D to a cogeneration project activity operating only in electricity generation mode
- SSC C/R AMS-I.D. v13 Applicability of AMS-I.D to a small scale hydro-electric project activity with power density less than 10 W/sq.m
- SSC C/R AMS-I.D. v13 Change in the amount of CERs from registered PDD
- SSC C/R AMS-I.D. v13 Clarification Request on Applicability of AMS. I.D. to a Project Activity, Which Will Sell Electricity to a Plant Instead of to a Provincial Grid
- SSC C/R AMS-I.D. v13 Clarification on AMS I.D. v12 on the installation of a backpressure turbine generator to a steam source that is in the baseline set-up
- SSC C/R AMS-I.D. v13 Clarification on installed/rated capacity of hydropower project
- SSC C/R AMS-I.D. v13 Clarification on leakage in project activity using animal litter
- SSC C/R AMS-I.D. v13 Clarification on the use of alternative biomass type than stated in the PDD applying AMS-I.D
- SSC C/R AMS-I.D. v13 Clarification on vintage of data and survey period for assessment of biomass availability in AMS-I.D
- SSC C/R AMS-I.D. v13 Clarification regarding project/leakage emissions from imported biomass
- SSC C/R AMS-I.D. v13 Fossil fuel combustion in hydro projects
- SSC C/R AMS-I.D. v13 Is plant oil produced from sustainable plantations a renewable biomass, and is it eligible under AMS-I.D?
- SSC C/R AMS-I.D. v13 Power output to grid in hydro projects
- SSC C/R AMS-I.D. v13 Request for revision on the monitoring of electricity in AMS-I.D
- SSC C/R AMS-I.D. v14 Clarification on the 15 MW eligibility limit for small-scale renewable energy projects
- SSC C/R AMS-I.D. v14 Clarification regarding the consideration of biomass assessment and leakage under AMS-I.D
- SSC C/R AMS-I.D. v14 Revision of AMS-I.D for renewable energy units delivering power to newly developed grids in the context of a PoA
- SSC C/R AMS-I.D. v14 Revision to AMS-I.D to include cover crops of short-cycle cellulosic biomass from non-dedicated plantations
- SSC C/R AMS-I.D. v15 Clarification on the monitoring of net electricity in AMS-I.D
- SSC C/R AMS-I.D. v15 Revision of AMS-I.D to include an additional option for EGestimated,y determination
- SSC C/R AR-ACM0001 AR_AM_CLA_0008: Methane emissions of biomass removed during the site preparation and burned outside the project boundary
- SSC C/R AR-ACM0001 AR_AM_CLA_0009: Ex post estimation of soil organic carbon
- SSC C/R AR-AM0001 AR_AM_CLA_0002: AR-CDM verifications per commitment period
- SSC C/R AR-AM0001 AR_AM_CLA_0007: Applicability for afforestation projects under AR-AM0001 ver.2
- SSC C/R AR-AM0004 AR-AM_REV_0001: Reforestation or afforestation of land currently under agricultural use – revised / amended version
- SSC C/R AR-AM0004 AR_AM_CLA_0001: Candidate areas and boundary definition
- SSC C/R AR-AM0005 AR-AM_REV_0002: Amendment of the leakages sections of ARAM0005 on activity displacement, using the respective sections of ARAM0004
- SSC C/R AR-AM0007 AR_AM_REV_0003: Allow the AR-AM0007 to consider displacement of grazing activities through leakage, as in AR-AM0003 and not only stop grazing activities when projects start
- SSC C/R AR-AMS0001 SSC_AR_003: Applicability concerning soil disturbance as a result of soil preparation
- SSC C/R AR_AM_CLA_0003: Palms and Bamboo and national forest threshold
- SSC C/R AR_AM_CLA_0004: Reporting Project Boundary and Plot Geometrics
- SSC C/R AR_AM_CLA_0005: Project Boundary of CDM A/R Projects
- SSC C/R AR_AM_CLA_0006: Consideration of herbaceous vegetation in baseline stocks
- SSC C/R SSC_AR_004: Implication of including palm in the national CDM forest definition on the status of AR CDM project
- UNEP Risoe CDM Wind Projects
- UNEP Risoe CDM Windpower Appendix 1 model 1 spreadsheet
- UNEP Risoe CDM Windpower Appendix 1 model 2 spreadsheet
- UNEP Risoe CDM Windpower Appendix 2 model spreadsheet
- UNEP Risoe CDM/JI Pipeline Analysis and Database spreadsheet current version